Get in touch

Rig floor

Rig Solutions

Tools that take people out of harm's way on the rig floor: Jet Rig washing tools and Easy Lift handling aids.

Made in OmanMade in Oman.

01Jet Rig

Washing tools for the mast, the BOP and the drill string.

01.1

Jet Mast Wash

MO ENERGY tool

A safer, faster way to clean the rig mast, torquing tube and monkey board in about 15 minutes, with nobody working at height. It connects to the TDS saver sub and uses helical jetting for thorough cleaning while lowering dropped-object risk.

  • Cleans the mast, torquing tube and monkey board without personnel working at height.
  • Helical jetting technology; reduces dropped-object risk.
Connection
4-1/2" IF box, to the TDS saver sub
Cleaning time
about 15 minutes

01.2

Jet String Wash

MO ENERGY tool

Cleans the drill string while tripping out of the hole, replacing rubber wipers and keeping people at a safe distance. Mist-spray nozzles cut the amount of water reaching the drilling fluid.

  • Replaces rubber wipers on the string and provides a safe distance while cleaning.
  • Nozzles designed to spray mist, reducing the water that may affect the drilling fluid.
  • Supports zone-management safety protocols.
  • Available in sizes up to 12 inches.

01.3

Jet BOP Wash

MO ENERGY tool

Cleans the inside of the BOP with 360-degree coverage. Helical pulsations and a wavy flow give the jetting force to remove stuck residues; mist-spray nozzles reduce water impact on the drilling fluid.

  • 360-degree coverage for thorough cleaning inside the BOP.
  • Helical pulsations and wavy flow give cleaning penetration and jetting force to remove stuck residues.
  • Durable, comfortable handles.

02Easy Lift

Lifting and handling aids that replace winches, slings and chain tongs.

FSOV Easy Lift: green lifting cage with a top lifting eye

02.1

FSOV Easy Lift

MO ENERGY tool

A safe, efficient way to install a full opening safety valve. It builds crew confidence and removes the need to spin the valve in with chain tongs.

  • Eliminates the need for chain tongs: the ring provides it.
  • Replaces the conventional utility-winch installation; the winch option remains available.
Available sizes
4-1/2" IF and 3-1/2" IF
Lift ring diameter
11 in
Minimum lift crew
2 personnel
Thread standard
API
Body length
0.6 m
Weight
18 kg
Inspection certified
As per operator
Low-Torque Valve Easy Lift: green lifting frame with rollers

02.2

Low-Torque Valve Easy Lift

MO ENERGY tool

Latch on to the low-torque valve and lift it by its handles, instead of hooking web slings to the elbow of the Chiksan line and using it as a lifting point.

  • Easy latch-and-lift with the handles.
  • No utility winch or web slings to rig up, and less permit-to-work burden.
Chiksun Lines Easy Lift: strap with two green handles on a pipe

02.3

Chiksun Lines Easy Lift

MO ENERGY tool

A manual-handling aid for lifting lines. It replaces utility winches and web slings, with two handling areas for two people, an easy-latching mechanism, an anti-slip grip and comfortable handles.

  • Replaces the need for a utility winch and web slings.
  • Two handling areas accommodate a two-person lift.
  • Helps prevent the hazard of an incorrect lift that may lead to long-term back pain.
  • Easy latching mechanism attaches to the low-torque valve; anti-slip grip; various lengths available.

✦Enquire

Have a question or ready to start a project? We're here to help.